Payback in Just 4–5 Years?
☀️

Payback in Just 4–5 Years?

Breaking Down the Real Math Behind a 3kW Solar System in Indore

A plain-English FAQ guide — 2026 pricing & subsidy data
Indore gets roughly 5.2–5.5 hours of strong, usable sunlight every single day — one of the best solar resources
of any major Indian city. Pair that with rising MPPKVVCL electricity tariffs and the PM Surya Ghar central
subsidy, and a 3kW rooftop system genuinely can pay for itself in about 4 to 5 years — then keep saving you
money for the next 20+.

💰 1. How much does a 3kW system actually cost in Indore?


Item Amount

Gross system cost (panels + inverter + structure + wiring + install) ₹1,80,000 – ₹2,20,000
PM Surya Ghar subsidy (fixed for 3kW) − ₹78,000
Net cost you pay ≈ ₹1,10,000 – ₹1,40,000
Why exactly 3kW?
The subsidy is tiered — ₹30,000/kW for the 1st kW, ₹30,000/kW for the 2nd kW,
and ₹18,000 for the 3rd kW — capping at ₹78,000.
Go bigger and you pay more without extra subsidy, so 3kW is the sweet spot for most Indore homes with monthly bills around ₹2,500–₹4,000.

☀️ 2. How much electricity will it actually generate?


With Indore's 5.2–5.5 peak sun hours/day, a well-installed 3kW system typically produces:
12–15 units (kWh) generated per day